You’re reading: Beharra Springs Project
You’re reading: Beharra Springs Project

Beharra Springs Project

Beharra Springs is located in the Perth Basin of WA, approximately 360 km north of Perth, and includes varying MEPAU and Beach Energy operated fields and associated facilities.

2014

Project Start Date

Dongara, WA

Project Location

MEPAU is the non-operator joint venture partner (50%) with Beach Energy for Beharra Springs in the Perth Basin of WA.

The Beharra Springs Gas Processing Facility is a 25 TJ/day plant, processing gas from nearby wells and transporting it through the Parmelia Gas Pipeline to domestic customers in WA.

25 TJ/day

Gas Production Capacity

Exploration
Exploration

Mitsui E&P Australia (MEPAU) has a strong history of exploration success with opportunities to significantly grow our gas...

Cygnus Hub (CCS development)
Cygnus Hub (CCS development)

The Cygnus Hub is our Carbon Capture and Storage (CCS) development planned with WesCEF in the Mid West...

Kipper Gas Project
Kipper Gas Project

Kipper is a producing conventional gas field located 45km off the coast of Victoria in the Gippsland Basin....